Pressurized Irrigation Turn On

Pressurized Irrigation Turn On
Posted on 03/03/2020
Public Works will turn on the pressurized irrigation around April 15th (can be up to two weeks before or after depending on weather). It takes two to three days to fully charge the system. Please check your valves and make sure your system is ready to avoid flooding from possible broken pipes or taps that are turned on.
View Our Cemetery Services